REISCH Maschinenbau

8” Log Handling

The log ramp and handling feed were fitted in front of the hall in order to completely remove the stacking operation from the production hall.

The logs are transferred from the ramp outside over a lowering roller table to an underground tunnel which then transports the logs into the hall. The logs are raised to the same height as the oven over a second integrated lifting-unit and then passed onto the already existing roller feed table.

8” Log Handling
8” Log Handling